E-Band and V-Band Spectrum

We defend your rights passionately and expertly.

[12 December 2020]

ICASA has updated the register of links within the self-regulated section of the E Band.

E-Band self-coordinated register March 2020

[16 March 2018]

ICASA has updated the register of links within the self-regulated section of the E Band.

E-Band self-coordinated-register-February 2018

[5 September 2017]

ICASA has released an initial register of links within the self-regulated segment of the E Band.

E-Band self-coordinated-register-July 2017

[29 April 2017]

ICASA has released comprehensive guidelines regarding the utilization of E-Band spectrum in South Africa, detailing a standardized set of procedures for applying for licenses or self-registering links within this frequency range.

Standard Operating Procedures for the E-Band 28 April 2017

E-Band Link Parameters Form

[28 November 2016]

The amendments to the Radio Frequency Spectrum Regulations 2015, permitting the use of these bands, were finalized and took effect on 22 November 2016.

Radio Frequency Spectrum Amendment Regulations 2016

[2 August 2016]

Outlined below are the various submissions received in response to the Discussion Document on the Use and Licensing of E-Band and V-Band:

[20 June 2016]

While the goal of this process was initially understood to be the amendment of the National Radio Frequency Plan (NRFP 2013) to include new allocations for these bands, ICASA has decided instead to incorporate its proposals into a set of draft amendments to the Radio Regulations 2015. This will be achieved through the addition of new regulations 16A and 16B.


The E Band

16A. Channel Plans

(1) The use of the E-Band shall be as follows:

(a) The band 71 -76 GHz is paired with 81 – 86 GHz.

(b) The plan is based on 2 x 19 basic channels of 250MHz with 10GHz duplex separation and 125MHz guard channels on the band edges.

(c) The basic channels can be aggregated to form higher bandwidth channels.

(2) The E Band is segmented as follows:

(a) A self-coordination block, 73.375-75.875 GHz paired with 83.375- 85.875 GHz which shall be referred to as Block A; and

(b) A block coordinated fully licensed by the Authority, 71.125- 73.125 GHz paired with 81.125-83.125 GHz which shall be referred to as Block B.

(3) The use of Block A shall be in the following manner:

(a) The prospective user shall notify the Authority of the position and technical details of the link (s) within 30-days of link deployment. Details of what needs to be notified are contained in Annex 1.

(b) Prior to link notification, the prospective user shall perform technical assessments against a database of already registered links. The link can only be registered once it has been established that it won’t cause harmful interference to the links in the database.

(4) The use of Block B shall follow the standard application process as prescribed in the Radio Frequency Spectrum Regulations, 2015.

(5) The Technical parameters reflected in Annexure 3 must be complied with.

The V Band

16B. Radio Frequency Spectrum Licence Exemption

(1) The use of the V band is licence exempt provided that technical parameters reflected in Annex B are complied with.

(2) The detailed frequency coordination is not required and there are no prescribed channel arrangements.

(3) Single frequency (TDD) systems and two frequency (FDD) systems may use any channel.

(4) The radio frequency spectrum fee is not applicable.”

This proposal aligns with industry expectations, and there will be an additional opportunity for interested parties to provide feedback, with the submission deadline set for 5 August 2016.

See radio frequency spectrum regulations 2015 for further information.

[5 October 2015]

The Discussion Document is predominantly technical and challenging to summarize or translate into English. Nonetheless, Ellipses have endeavored to…

Summary E-Band and V-Band Discussion Document Oct 2015

[27 September 2015]

This resource might be helpful:

ETSI White Paper 9 E-Band and V-Band – Survey on status of worldwide regulation (June 2015)

[9 September 2015]

ICASA has released a Discussion Document on the use and licensing of the 57 – 66 GHz (V-Band) and the 71 – 76 GHz paired with the 81 – 86 GHz (E-Band). This follows requests from operators and equipment vendors seeking access to these bands and highlights the need for a regulatory framework that considers the unique characteristics of these frequencies.

Discussion Document on Use and Licensing of E-Band and V-Band

Submissions are due by 27 November 2015 and can be emailed to Mr. Mandla Samuel Mchunu at MMchunu@icasa.org.za.

It’s noteworthy that ICASA initiated this process within a year of public calls for regulatory action, which were made at the Wireless Access Providers’ Association (WAPA) Future Wireless Technology Event in June 2015. The Discussion Document’s focus on “licence exemption where feasible and light-licensing where full exemption is not feasible” is particularly commendable.